  • Project Overview

    A 17 week fit out project for Biogen Inc resulted in a top specification commercial space within the client’s Maidenhead offices. Over 4 floors WOW installed an array of internal structural elements to emphasise and compliment the variety of uses for the space, including the installation of Optima 117 single glazing throughout. A phased approach allowed the £850k works to be scheduled and completed in partnership with Overbury.

  • Build Details

    WOW installed a variety of ceiling types including SAS 130 and 150 systems and MF ceilings to meet the project brief. Noise suppression components such as acoustic barriers at ceiling lines and 12.8mm acoustic Stadip glass were installed to enhance privacy. WOW managed to maintain an open-plan commercial office space with the use of the Optima 117 single glazed system and a series of Microflush door frames and Kinetic sliding doors.

  • Construction Challenges

    In order to meet the project budget, WOW undertook a system of value engineering at various stages from the beginning to the end of the build. By cooperating closely with main contractors, Overbury, 4 short phases of works enabled WOW to succeed in supplying the client with the solutions it required.

1 / 3
Project Overview Build Details Construction Challenges